CR 110 South

Location CR 110 South (US 79 to Limmer Loop)
Description

The project will upgrade the existing two-lane roadway to a three-lane roadway (half of an ultimate six lane facility). The schematic design and Right-of-Way footprint will consider the ultimate typical section for a six-lane divided roadway. 

For information on CR 110 North from CR 107 to north of Sam Houston Parkway, click here.

For information on CR 110 Middle from north of Limmer Loop to CR 107, click here.

Status Design is complete.  Construction contract was awarded to Chasco Constructors for the interim three-lane section. The schematic design and Right-of-Way footprint are complete for the ultimate typical section of a six-lane divided roadway. Construction began in January 2017 and is anticipated to be completed in Summer 2018.  To view the weekly update, click here.

CR 110 Closure
The County's contractor will close CR 110 at US 79 on December 19, 2017, between the hours of 9 a.m. and 4 p.m. This is necessary to place pavement on CR 110 at the tie-in to US 79. Message boards advising the public of the closure will be placed in advance of the closure. The detour route is to utilize CR 122 and Red Bud lane. To view the detour map, click here
Contact Email roads@wilco.org or phone 512-846-1190